SMOGRR009
| Title: |
Submittal Timeline for EPS Metering Design Proposals
|
| Next Group: |
|
| Next Step: |
|
| Status: |
Approved
on 10/07/2010
|
| Date |
Gov Body |
Motion |
Result |
Against |
Abstentions |
|
10/07/2010
|
TAC
|
To approve SMOGRR009 as recommended by WMS in the 9/22/10 WMS Report.
|
Passed
|
0
|
0
|
|
09/22/2010
|
WMS
|
To recommend approval of SMOGRR009 as recommended by mwg in the 9/21/10 MWG Report.
|
Passed
|
0
|
1 Ind Gen
|
|
09/21/2010
|
MWG
|
Consensus to endorse and forward the 8/17/10 MWG Report and Impact Analysis for SMOGRR009 to WMS.
|
Passed
|
|
|
|
08/17/2010
|
MWG
|
Consensus to recommend approval of SMOGRR009 as submitted.
|
Passed
|
|
|
Vote tallies here reflect individual votes, not the weight of the votes by market segment. Affirmative votes are not recorded in these vote tallies. For additional details on the voting record, please consult the Recommendation or Action Report, or the official vote tally if available, as posted in the key documents.
| Status: |
Approved
|
| Date Posted: |
07/15/2010
|
| Sponsor: |
ERCOT
|
| Urgent: |
No
|
| Sections: |
3.2.1
|
| Description: |
This Settlement Metering Operating Guide Revision Request (SMOGRR) changes the timeline for Transmission and/or Distribution Service Provider (TDSP) submittal of ERCOT-Polled Settlement (EPS) Metering Design Proposal.
|
| Reason: |
The submittal timeline in the SMOG in regards to EPS Metering Design Proposals will need to change to reduce risk associated with ERCOT generating production-ready network models.
|
-
(07/15/10, .doc, 87.5 KB)
-
(07/15/10, .doc, 68 KB)
-
(07/15/10, .doc, 44 KB)
-
(08/17/10, .doc, 94.5 KB)
-
(09/21/10, .doc, 95 KB)
-
(09/23/10, .doc, 84.5 KB)
-
(10/08/10, .doc, 85.5 KB)