SCR759
| Title: |
acLineSegment Name Length Increase in Information Model Manager
|
| Next Group: |
|
| Next Step: |
Parking Deck - Impact Analysis and budget review
|
| Status: |
Approved
on 09/21/2010
|
| Date |
Gov Body |
Motion |
Result |
Against |
Abstentions |
|
09/21/2010
|
Board of Directors
|
To approve SCR759 as recommended by TAC in the 9/2/10 TAC Report.
|
Passed
|
|
|
|
09/02/2010
|
TAC
|
To recommend approval of SCR759 as recommended by PRS in the 8/19/10 PRS Report with a priority of High.
|
Passed
|
0
|
0
|
|
08/19/2010
|
PRS
|
To recommend a priority of High for SCR759.
|
Passed
|
0
|
0
|
|
08/12/2010
|
ROS
|
To endorse and forward the 7/15/10 ROS Report and Impact Analysis for SCR759 to TAC with a recommended priority of High.
|
Passed
|
0
|
0
|
|
07/15/2010
|
ROS
|
To recommend approval of SCR759 as submitted.
|
Passed
|
0
|
0
|
Vote tallies here reflect individual votes, not the weight of the votes by market segment. Affirmative votes are not recorded in these vote tallies. For additional details on the voting record, please consult the Recommendation or Action Report, or the official vote tally if available, as posted in the key documents.
| Status: |
Approved
|
| Date Posted: |
05/27/2010
|
| Sponsor: |
SSWG
|
| Urgent: |
No
|
| Sections: |
N/A
|
| Description: |
This System Change Request (SCR) proposes to increase the allowable character size of the acLineSegment type under the Line Equipment Container from two to 14 in the Information Model Manager.
|
| Reason: |
Multi-section line models have been used by transmission planners in Siemens Power System Simulator for Engineering (PSSE) power flow software for over 20 years as a tool for correctly simulating contingencies on the ERCOT System for planning studies. The Topology Processor enhancement approved by ERCOT in April 2010 to add multi-section line definitions to the raw file output requires all line segments of the multi-section line to be modeled under the same Line Equipment Container in the Network Operations Model. The reason that some Transmission Service Providers (TSPs) are not modeling line segments in this manner in the Information Model Manager is that the acLineSegment name is currently limited to two characters, which is too limiting for many TSPs line segment IDs. To be able to make this change to the Network Operations Model, the acLineSegment name must be increased. If this increased name size is not changed, the multi-section line functionality of the Topology Processor cannot be utilized.
|
-
(05/27/10, .doc, 181 KB)
-
(05/27/10, .doc, 70.5 KB)
-
(07/16/10, .DOC, 190 KB)
-
(07/27/10, .doc, 45 KB)
-
(08/12/10, .DOC, 192.5 KB)
-
(08/23/10, .doc, 190.5 KB)
-
(09/03/10, .doc, 198 KB)
-
(09/22/10, .doc, 183 KB)
-
(12/05/10, .doc, 87 KB)