OGRR242
| Title: |
Section 7 Revisions to Meet Pending NERC Requirements for New Construction
|
| Next Group: |
|
| Next Step: |
|
| Status: |
Withdrawn
on 07/15/2010
|
| Date |
Gov Body |
Motion |
Result |
Against |
Abstentions |
|
03/11/2010
|
ROS
|
To refer OGRR242 to the OGRR240/242 Task Force.
|
Passed
|
0
|
0
|
|
|
|
To grant Urgent status
|
Passed
|
|
|
Vote tallies here reflect individual votes, not the weight of the votes by market segment. Affirmative votes are not recorded in these vote tallies. For additional details on the voting record, please consult the Recommendation or Action Report, or the official vote tally if available, as posted in the key documents.
| Status: |
Withdrawn
|
| Date Posted: |
03/01/2010
|
| Sponsor: |
SPWG
|
| Urgent: |
Yes
|
| Sections: |
7.2.2, 7.2.4, 7.2.5.1, 7.2.5.2, 7.2.5.3
|
| Description: |
This Operating Guide Revision Request (OGRR) revises Operating Guide to meet the needs of the changes in the ERCOT Transmission System including CREZ requirements. The revised language reflects the majority opinion of the System Protection Working Group (SPWG) and is a result of a collaborative effort.
|
| Reason: |
The reasons for this OGRR are:
1. To update the current Operating Guide to meet current practices;
2. Provide protection standards updates for all lines including CREZ lines; and, 3. Meet pending NERC Reliability Standards using all available technologies and applying standards to a wide range of new construction.
|