NPRR243
| Title: |
Load Resource Disqualification, Unannounced Testing, and Compliance
|
| Next Group: |
|
| Next Step: |
|
| Status: |
Approved
on 09/21/2010
|
| Related Issue: |
PRR714 |
| Date |
Gov Body |
Motion |
Result |
Against |
Abstentions |
|
09/21/2010
|
Board of Directors
|
To approve NPRR243 as recommended by TAC in the 9/2/10 TAC Report.
|
Passed
|
|
|
|
09/02/2010
|
TAC
|
To recommend approval of NPRR243 as recommended by PRS in the 8/19/10 PRS Report.
|
Passed
|
0
|
0
|
|
08/19/2010
|
PRS
|
To endorse and forward the 7/22/10 PRS Report, as amended by the 8/2/10 TIEC comments, and Impact Analysis for NPRR243 to TAC.
|
Passed
|
0
|
0
|
|
07/22/2010
|
PRS
|
To recommend approval of NPRR243 as amended by the 7/21/10 WMS comments and as revised by PRS.
|
Passed
|
0
|
0
|
|
06/17/2010
|
PRS
|
To table NPRR243.
|
Passed
|
0
|
0
|
Vote tallies here reflect individual votes, not the weight of the votes by market segment. Affirmative votes are not recorded in these vote tallies. For additional details on the voting record, please consult the Recommendation or Action Report, or the official vote tally if available, as posted in the key documents.
| Status: |
Approved
|
| Date Posted: |
06/03/2010
|
| Sponsor: |
WMS
|
| Urgent: |
No
|
| Sections: |
8.1.1.1, 8.1.1.4.2
|
| Description: |
This Nodal Protocol Revision Request (NPRR) incorporates relevant language from Protocol Revision Request (PRR) 714, Qualification and Periodic Testing of Loads acting as Resources (LaaRs), and synchronizes the Nodal Protocols with the current zonal requirements for the periodic testing and suspension of a Load Resource for non-performance.
|
| Reason: |
To synchronize the Nodal Protocols with current zonal requirements.
|
-
(06/03/10, .doc, 93.5 KB)
-
(06/03/10, .doc, 72.5 KB)
-
(06/21/10, .doc, 105 KB)
-
(07/21/10, .doc, 54.5 KB)
-
(07/26/10, .doc, 109.5 KB)
-
(07/28/10, .doc, 58.5 KB)
-
(07/29/10, .doc, 49.5 KB)
-
(08/02/10, .doc, 56 KB)
-
(08/23/10, .doc, 114.5 KB)
-
(09/07/10, .doc, 117 KB)
-
(09/21/10, .doc, 118 KB)