NPRR220
| Title: | Nodal Requirement of Declaring an EEA for Reserves More than 500 MW |
| Next Group: | |
| Next Step: | |
| Status: | Approved on 09/21/2010 |
| Date | Gov Body | Action Taken | Next Steps | |
|---|---|---|---|---|
| 09/21/2010 | Board of Directors |
|
Approved | |
| 09/02/2010 | TAC |
|
Recommended for Approval | Board Consideration |
| 08/19/2010 | PRS |
|
Recommended for Approval | TAC Consideration |
| 08/19/2010 | PRS |
|
Recommended for Approval | PRS IA Review |
| 07/22/2010 | PRS | Deferred/Tabled | PRS Language Consideration | |
| 06/17/2010 | PRS |
|
Referred | PRS Review |
| 04/22/2010 | PRS |
|
Referred | PRS Consideration |
| Date | Gov Body | Motion | Result | Against | Abstentions |
|---|---|---|---|---|---|
| 09/21/2010 | Board of Directors | To approve NPRR220 as recommended by TAC in the 9/2/10 TAC Report | Passed | ||
| 09/02/2010 | TAC | To recommend approval of NPRR220 as recommended by PRS in the 8/19/10 PRS Report | Passed | 0 | 0 |
| 08/19/2010 | PRS | To forward NPRR220 and the Impact Analysis to TAC | Passed | 0 | 0 |
| 08/19/2010 | PRS | To recommend approval of NPRR220 as submitted | Passed | 1 Indep. Gen | |
| 07/22/2010 | PRS | To table NPRR220 for one month. All Market Segments were present for the vote | Passed | 0 | 0 |
| 06/17/2010 | PRS | To refer NPRR220 to the Nodal Advisory Task Force (NATF) | Passed | 0 | 0 |
| 04/22/2010 | PRS | To refer NPRR220 to the Reliability and Operations Subcommittee (ROS) | Passed | 0 | 0 |
Vote tallies here reflect individual votes, not the weight of the votes by market segment. Affirmative votes are not recorded in these vote tallies. For additional details on the voting record, please consult the Recommendation or Action Report, or the official vote tally if available, as posted in the key documents.
| Status: | Approved |
| Date Posted: | 03/24/2010 |
| Sponsor: | ERCOT |
| Urgent: | No |
| Sections: | 6.5.7.6.2.2 |
| Description: | This Nodal Protocol Request (NPRR) removes the requirement to declare an Energy Emergency Alert (EEA) prior to deploying more than 500 MW of Responsive Reserve (RRS). |
| Reason: |
To align the Nodal Protocols with the North American Electric Reliability Corporation (NERC) Reliability Standards, specifically EOP-002-2.1, Capacity and Energy Emergencies, which provides in pertinent part:
R6. If the Balancing Authority cannot comply with the Control Performance and Disturbance Control Standards, then it shall immediately implement remedies to do so. These remedies include, but are not limited to: R6.1. Loading all available generating capacity. R6.2. Deploying all available operating reserve. … |
-
(03/24/10, .DOC, 81 KB)
-
(03/24/10, .doc, 66 KB)
-
(03/24/10, .doc, 45.5 KB)
-
(04/27/10, .DOC, 87 KB)
-
(06/10/10, .doc, 38.5 KB)
-
(06/21/10, .DOC, 88 KB)
-
(07/26/10, .DOC, 88 KB)
-
(08/18/10, .doc, 38 KB)
-
(08/24/10, .DOC, 90 KB)
-
(09/07/10, .DOC, 93.5 KB)
-
(09/23/10, .DOC, 95.5 KB)