NOGRR051
| Title: |
Synchronization with OGRR192 and OGRR238
|
| Next Group: |
|
| Next Step: |
|
| Status: |
Approved
on 10/07/2010
|
| Date |
Gov Body |
Motion |
Result |
Against |
Abstentions |
|
10/07/2010
|
TAC
|
To approve NOGRR051 as recommended by ROS in the 9/16/10 ROS Report and as revised by TAC
|
Passed
|
0
|
0
|
|
09/16/2010
|
ROS
|
To recommend approval of NOGRR051 as amended by the 9/10/10 ERCOT comments and as revised by ROS
|
Passed
|
1 Indep. Gen.
|
0
|
|
|
|
To grant Urgent status to NOGRR051, Synchronization of OGRR192 and OGRR238
|
Passed
|
|
|
Vote tallies here reflect individual votes, not the weight of the votes by market segment. Affirmative votes are not recorded in these vote tallies. For additional details on the voting record, please consult the Recommendation or Action Report, or the official vote tally if available, as posted in the key documents.
| Status: |
Approved
|
| Date Posted: |
08/17/2010
|
| Sponsor: |
ERCOT
|
| Urgent: |
Yes
|
| Sections: |
2.2.7, 2.3, 8C
|
| Description: |
This Nodal Operating Guide Revision Request synchronizes the Nodal Operating Guides with two approved Operating Guide Revision Requests (OGRRs), OGRR192, Combustion Turbine Governor Performance Test Forms and OGRR238, WGR Primary Frequency Response. This Nodal Operating Guide Revision Request (NOGRR) adds new governor performance and Wind-powered Generation Resource (WGR) primary frequency response testing procedures.
|
| Reason: |
This NOGRR synchronizes the Nodal Operating Guides with OGRR192 and OGRR238. This revision adds or clarifies combustion turbine Governor performance testing procedures and includes new procedures for testing Wind-powered Generation Resources (WGRs) Primary Frequency Response design requirements.
|
-
(08/17/10, .doc, 222 KB)
-
(08/17/10, .doc, 66.5 KB)
-
(08/17/10, .doc, 43 KB)
-
(08/19/10, .xls, 129.5 KB)
-
(08/25/10, .doc, 194 KB)
-
(09/10/10, .doc, 196 KB)
-
(09/20/10, .doc, 213.5 KB)
-
(10/08/10, .doc, 216.5 KB)