NOGRR048
| Title: |
Synchronization with OGRR240, CREZ Facility Protection and Control Requirements
|
| Next Group: |
|
| Next Step: |
|
| Status: |
Approved
on 11/04/2010
|
| Date |
Gov Body |
Motion |
Result |
Against |
Abstentions |
|
11/04/2010
|
TAC
|
To approve of NOGRR048 as amended by the 10/25/10 OWG comments and as revised by TAC
|
Passed
|
0
|
0
|
|
10/19/2010
|
ROS
|
To recommend approval of and forward the 9/23/10 OWG Report and Impact Analysis for NOGRR048 to TAC
|
Passed
|
4 2 - IOU; 2 Municipal
|
|
|
09/23/2010
|
OWG
|
Consensus to recommend approval of NOGRR048 as revised by OWG
|
|
|
|
|
08/18/2010
|
OWG
|
Consensus to recommend approval of NOGRR048 as revised by OWG
|
|
|
|
Vote tallies here reflect individual votes, not the weight of the votes by market segment. Affirmative votes are not recorded in these vote tallies. For additional details on the voting record, please consult the Recommendation or Action Report, or the official vote tally if available, as posted in the key documents.
| Status: |
Approved
|
| Date Posted: |
07/23/2010
|
| Sponsor: |
AEPSC
|
| Urgent: |
Yes
|
| Sections: |
6.2.1, 6.2.1.2, 6.2.4, 6.2.5.1.1, 6.2.5.1.3, 6.2.5.1.5, 6.2.5.2.1, 6.2.5.2.2, 6.2.5.2.3, 6.2.5.2.6, 6.2.5.2.7, 6.2.5.2.8, 6.2.5.3.1, 6.2.5.3.2, 6.2.5.3.3, 6.2.5.3.6, 7.1.2
|
| Description: |
This Nodal Operating Guide Revision Request (NOGRR) provides more stringent protection and control requirements for all new Competitive Renewable Energy Zone (CREZ) 345 kV Facilities.
|
| Reason: |
This NOGRR provides requirements for the protection and control for the CREZ transmission system that supports the transfer of renewable energy reliably from remote areas to large Load centers. This NOGRR is aimed at achieving fault clearing within the voltage curve described in North American Electric Reliability Corporation (NERC) Draft Reliability Standard PRC-024-01, Generator During Frequency and Voltage Excursions (http://www.nerc.com/docs/standards/sar/PRC-024-1_Draft1_2009Feb17.pdf). The proposed revisions also address new NERC Planning (http://www.nerc.com/filez/standards/Assess-Transmission-Future-Needs.html) and Protection (http://www.nerc.com/docs/standards/sar/Project2009-07_Tech_Paper_Reliability_of_Protection_Systems_2009Jan20.pdf)standards currently under consideration.
|
-
(07/23/10, .doc, 170 KB)
-
(07/23/10, .doc, 66.5 KB)
-
(08/20/10, .doc, 177.5 KB)
-
(08/25/10, .doc, 47.5 KB)
-
(09/27/10, .doc, 181.5 KB)
-
(10/12/10, .xls, 131 KB)
-
(10/19/10, .xls, 131 KB)
-
(10/22/10, .doc, 185 KB)
-
(10/25/10, .doc, 149.5 KB)
-
(11/08/10, .doc, 194.5 KB)