Current Nodal Operating Guides
View the most recent version of the Nodal Operating Guide below. Find historical versions in the Nodal Operating Guide Library.
-
Section 1: Overview
(04/16/2012, .doc, 194 KB) -
Section 2: System Operations and Control Requirements
(02/13/2012, .doc, 189 KB) -
Section 3: Resource Testing and Qualification Procedures
(02/13/2012, .doc, 98 KB) -
Section 4: Emergency Operation
(12/13/2011, .doc, 152 KB) -
Section 5: Network Operations Modeling Requirements
(01/10/2012, .doc, 54.5 KB) -
Section 6: Disturbance Monitoring and System Protection
(09/30/2011, .doc, 143 KB) -
Section 7: Telemetry and Communication
(07/28/2011, .doc, 145 KB) -
Section 8 - Attachment A: Detailed Black Start Information
(10/06/2011, .doc, 56.5 KB) -
Section 8 - Attachment B: Relay Misoperation Report
(09/30/2011, .doc, 70.5 KB) -
Section 8 - Attachment C: Turbine Governor Speed Tests
(12/12/2011, .doc, 161 KB) -
Section 8 - Attachment D: Seasonal Unit Net Real Power Capability Verification
(11/22/2010, .doc, 31.5 KB) -
Section 8 - Attachment E: Black Start Plan Template
(10/06/2011, .doc, 47.5 KB) -
Section 8 - Attachment F: Seasonal Hydro Responsive Reserve Net Capability Verification
(11/22/2010, .doc, 30.5 KB) -
Section 8 - Attachment G: Load Resource Tests
(11/22/2010, .doc, 36.5 KB) -
Section 8 - Attachment H: Unit Alternative Fuel Capability
(11/22/2010, .doc, 157 KB) -
Section 9 - Monitoring Programs
(03/05/2012, .doc, 139.5 KB) -
Table of Contents
(04/16/2012, .doc, 48 KB)