Generation

This section contains information related to Reliability Unit Commitment (RUC) constraints and Reliability Must Run (RMR) Resource deployments. Additional documentation pertaining to resource asset registration and outage scheduling is provided in the Key Documents section, as are the monthly ERCOT Wind Integration Reports.

Current Information
Daily RUC Active and Binding Transmission Constraints Opens new browser window
View the list of all active and binding constraints observed in the Day-Ahead Reliability Unit Commitment process.
Hourly RMR Services Deployed Opens new browser window
View hourly MW amount dispatched for each Reliability Must Run (RMR) Resource.
Hourly RUC Active and Binding Transmission Constraints Opens new browser window
View the list of all active and binding constraints observed in the Hourly Reliability Unit Commitment process.
Wind Power Production - Hourly Averaged Actual and Forecasted Values Opens new browser window
This report is posted every hour and includes System-wide and Regional actual hourly averaged wind power production, STWPF, WGRPP and COP HSLs for On-Line WGRs for a rolling historical 48-hour period as well as the System-wide and Regional STWPF, WGRPP and COP HSLs for On-Line WGRs for the rolling future 48-hour period.
Wind Power Production - Actual 5-Minute Averaged Values Opens new browser window
This report is posted every 5 minutes and includes System-wide and Regional actual 5-minute averaged wind power production for a rolling historical 60-minute period.

Opens new browser window System or application launches in a new browser window.


Key Documents